Alliance Weekly Engineer Board Change
Latest News
Engineers:
Board 101: Cut 2 (-2) to 25
Board 311: Remain at 32
Board 511: Remain at 44
Board 141: Remain at 3
Conductors:
Board 100: Cut 1 (-1) to 28
Board 310: Add 1 (+1) to 36
Board 510: Cut 3 (-3) to 40
Board 140: Add 1 (+1) to 5
212 Total Sets in service as of Saturday, June 14th, 2025
Download:
16June2025 Board Change for Distribution.pdf
|
|
Engineers:
Board 101: Remain at 27
Board 311: Add 2 (+2) to 32
Board 511: Remain at 44
Board 141: Remain at 3
Conductors:
Board 100: Remain at 29
Board 310: Add 2 (+2) to 35
Board 510: Cut 1 (-1) to 42
Board 140: Remain at 4
206 Total Sets in service as of Saturday, June 7th, 2025
Download:
09June2025 Board Change for Distribution.pdf
|
|
|
Engineers:
Board 101: Remain at 27
Board 311: Cut 2 (-2) to 32
Board 511: Remains at 44
Board 141: Remain at 3
208 Total Sets in service as of Saturday, May 24th, 2025
Download:
26May2025 Board Change for Distribution.pdf
|
|
Engineers:
Board 101: Remain at 27
Board 311: Remain at 32
Board 511: Cut 7 (-7) to 44
Board 141: Remain at 3
Conductors:
Board 100: Remain at 29
Board 310: Remains at 35
Board 510: Cut 4 (-4) to 47
Board 140: Remain at 4
208 Total Sets in service as of Saturday, May 17th, 2025
Download:
19May2025 Board Change for Distribution.pdf
|
|
|
|
This is the distribution list for those under 6/3 Rest Cycles.
Please note it only applies to 6/3 Rest Cycles as a guide to let you know which letters will be next to be added or removed.
This Guide applies only to locations if your 6/3 starts with Letter I.

|
|
|
The board calculation by the union is suggested to the carrier for their approval. This change is not set in stone and can be changed at the carrier's discretion as long as it is within the agreed-upon window for that specific pool.
Short Pool:
Turns called on Alliance Board 501, Edgemont 201, Guernsey 411, Sterling 411, and any short pool engineers used on 801, are added together for the 15-day look-back period. This total is multiplied by 2 to give an average for 30 days. That number is then divided by 21 and 25 to establish the active start window for the pool. If the current number of turns is within the window there will be NO CHANGE for that week. If the number of turns is outside the window, there will be either an ADD or a CUT to get the number within the window. These changes will typically be made to the middle of the window, but not always.
Long Pool:
Turns called on Alliance board 511, off turn on 621, and all Non-PWS engineers called on Grand Island 101 are added up for the 15-day look-back period. This total is multiplied by 2 to give an average for 30 days. That number is then divided by 14 and 16 to establish the active start window for the pool. If the current number of turns is within the window there will be NO CHANGE for that week. If the number of turns is outside the window, there will be either an ADD or a CUT to get that number within the window. These changes will typically be made to the middle of the window, but not always.
|
|
|
|
|
|
Page Last Updated: Jan 04, 2021 (19:14:16)
|
|