BLE-T Division 622
 

×
Register an Account
Forgot Login?
Board Change: 601 - N/C (75) 511 - N/C (57)
Nov 14, 2021

Alliance Engineer Pools Board Change for November 15th

The Grand Pool will remain at 75 turns and not change this week. The current working start window is 71-77 turns and the average pool turn is working 23 starts per month. If regulated by mileage pool would be 54-55 turns.

The East Pool will remain at 57 turns and not change this week. The current working start window is 48-57 turns and the average pool turn is working 15 starts per month. If regulated by mileage pool would be 56-58 turns.


Download:


-
BLE-T Division 622
723 FLACK AVE
ALLIANCE, NE 69301
 

Top of Page image
Powered By UnionActive - Copyright © 2024. All Rights Reserved.